One of my larger
projects as a Senior Consultant for NCR was to develop and implement a plan to
upgrade ALL Unix server for a major customer nationwide. This customer had over
1800 NCR Unix system throughout the country which needed to be upgraded before
the year 2000. Due to poor customer planning this request came in near the end
of 1999 as an emergency request. My task was to design a plan to upgrade all
these systems in the shortest time possible. Another issue to consider was that
a typical system upgrade required the system to be offline 6-8 hours. |